DIRFLOW MASTER MONITOR MOAT DFE35

Founder / CEO Command & Integration Monitoring Platform

JST
H0 DIRHAMHuman Authority • Hak Veto
UAT v0.4 — RECONCILED READ-ONLY SNAPSHOT • 24 Sep 2026 13:06 JST • 16/16 canonical accounted • 4/4 Surge governed • MASTER 5/10 enabled • raw scheduler enabled 7 • enforcement 17/20. No scheduler state is promoted to PASS/VERIFIED.
PROJECT LANES
—/20
WAITING EVIDENCE
AUTOMATION
—/20
WAITING EVIDENCE
SYNC STATUS
—/20
WAITING EVIDENCE
UAT RESULT
—/20
WAITING EVIDENCE
CRITICAL BLOCKERS
—
WAITING EVIDENCE

MASTER DIRA

Founder Consultation & Command Room

Satu pintu untuk melihat kondisi 20 lane, status sinkronisasi, UAT, blocker, evidence, dan Human Action tanpa menyentuh production.

ECOSYSTEM GLOBAL HEALTH

LIVE CONTROL SNAPSHOT
Scheduler + Registry + Surge reconciliation
Canonical Project Homes16/16 ACCOUNTED
Surge Governance4/4
MASTER Scheduler5/10 ENABLED
Raw Scheduler7 ENABLED
Enforcement17/20

QUICK ACCESS

MOAT DEFENSE CENTER

READ-ONLY
  • Human Authority Gate
  • Production NO-TOUCH
  • One mutation owner
  • Evidence Before Trust

SYNC CLOSURE

— DAYS
  • Target: 30 September 2026
  • Prepare → Verify → Sync → Standby
  • No jump over blocker/evidence gates

AUTOMATION POLICY

EVIDENCE
  • Hourly enforcement target
  • No fake percentage
  • No-delta → change method / kill-switch
  • Preserve checkpoint before failover

PROJECT LANES OVERVIEW

#Project / SystemStateAutomationLast Material DeltaSyncUATBlockerEvidenceHuman Action

20 Project Lanes

16 canonical Project Homes + 4 governed Surge slots. Scheduler state is evidence, not project PASS.

#Project / SystemStateAutomationLast Material DeltaSyncUATBlockerEvidenceHuman Action

Sync Control

Status sinkronisasi ekosistem • READ-ONLY.

ENFORCEMENT
—/20
BLOCKER
—
MASTER SCHEDULER
—
SYNC STATUS
WAITING
NEXT ACTION
Loading current control snapshot...

UAT & QA

Status pengujian 20 lane • READ-ONLY.

PASS
—
PARTIAL
—
BELUM VERIFIED
—
PERLU H0
—
PRIORITAS UAT BERIKUTNYA
Loading...
PROJECT UAT BLOCKER HUMAN ACTION

Blocker & Risk

Hambatan utama menuju closure • READ-ONLY.

CRITICAL BLOCKER
—
ENFORCEMENT
—/20
NEXT TARGET
—
PROJECT BLOCKER STATE NEXT ACTION

Automation

Kontrol scheduler menuju 20 lane aktif • READ-ONLY.

MASTER ON
—/10
RAW ON
—
STALE
—
STATUS
LOADING
NEXT AUTOMATION TARGET
Loading...
PROJECT AUTOMATION LAST DELTA BLOCKER

Evidence Gate-01

Current DIRFLOW Gate-01 browser-only validation logic preserved.

Contract Handoff Test

WAITING TEST
Production write DENY.

Acceptance Criteria

11 field wajib tersedia—
Tidak ada field liar—
OWNER tidak kosong—
RISK_FLAGS berupa daftar—
Timestamp timezone—
AI auto approval ditolak—

Human Approval

HUMAN DECISION: PENDING

Evidence Payload

Belum ada hasil uji.
WAITING EVIDENCE\n\nNo runtime evidence loaded.

Activity Log

Hanya perubahan material yang tercatat.

MATERIAL DELTA • READ-ONLY
PROJECT MATERIAL DELTA STATE EVIDENCE
WAITING EVIDENCE

VAULT / SOP

Referensi kendali utama DFE35 • READ-ONLY.

REFERENCE KATEGORI STATUS FUNGSI
DFE35 AI WORKING GATE GOVERNANCE ACTIVE Rujukan kontrol AI / executor
Evidence Gate-01 EVIDENCE ACTIVE Evidence + Human Approval
Activity Log EVIDENCE ACTIVE Material delta tercatat
September Integration Closure CLOSURE PROSES Target 30 September 2026
Production NO-TOUCH POLICY LOCKED UAT tidak melakukan production write
Copied